Study group 19 telecommunication standardization sector



Yüklə 87.41 Kb.
tarix10.04.2016
ölçüsü87.41 Kb.


INTERNATIONAL TELECOMMUNICATION UNION

STUDY GROUP 19

TELECOMMUNICATION
STANDARDIZATION SECTOR

STUDY PERIOD 2005-2008



TD 405 Rev.1 (GEN/19) - PUBLIC

English only

Original: English

Question(s):

1/19

Geneva, 19-27 July 2006

TEMPORARY DOCUMENT

Source:

Rapporteur, Q.1/19

Title:

Report on Question 1/19 Meeting in Geneva, 19-27 July 2006

Table of Contents



1 Organization of Meeting 2

1.1 Meeting Identification, Chairmanship and Participation 2

1.2 Meeting Agenda 2

2 Key Results 2

2.1 Work Items Progressed 2

3 Meeting Documentation 2

4 Liaison Statements 2

5 Recommendation Status and Work Plan 2

5.1 Future Work 3

6 Detailed Report of Discussions 3

6.1 Opening Plenary 3

6.2 General Items 3

6.3 Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB) 4

6.4 Review of Work Plan for Planned Deliverables 4

6.5 Closing Plenary of Q.1/SSG 4

6.6 Review of Meeting Report. 4

7 Acknowledgements 5

Annex 1 – Work Plan 6

Annex 2 – List of documents 10




1Organization of Meeting

1.1Meeting Identification, Chairmanship and Participation


This is the report of a meeting of Q.1/19: Service and network capability requirements and network architecture.

Q.1/19 met in Geneva, during the SG19 Meeting, 19-27 July 2006. The meeting was chaired by Mr. Bruno Ramos, Q.1/19 Rapporteur, and by Mr. Atsushi Minokuchi, Co-Editor of Q.FNAB.

The meeting was attended by 12 participants from 7 countries.

1.2Meeting Agenda


The Meeting Agenda was published in Temporary Document TD-385 R1. It was reviewed and approved.

2Key Results

2.1Work Items Progressed


  • Discussions and elaboration of the 5th Draft of ITU-T PDNR: Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB), based on the Delayed Contributions D.42, D.62, D.65 and D.66.

  • Reviewed, and agreed to the work plan for Q.1/19.

3Meeting Documentation


Documents considered at this meeting are listed in Annex 2.

All documents are available at:



http://www.itu.int/md/T05-SG19-060719/sum/en

4Liaison Statements


The meeting resulted in the preparation, with Q.2/19, Q.5/19 and Q.6/13, of one Liaison Statement to ITU-R WP 8F (TD 401 R1).

This LS is a response to the LS from WP 8F.

The LS from WP 8F contains the draft document towards PDNR ITU-R M. [IP CHAR] from WP 8F Bangkok meeting. It was reviewed by Q.1/19 and during a joint meeting of Q.2/19, Q.5/19, and Q.6/13.

5Recommendation Status and Work Plan


Status and Work Plan for Recommendations and other deliverables under the responsibility of this Question are summarized in Annex 1.

5.1Future Work


The next activity of Question 1/19 will be in the form of two Rapporteur Meetings before the next SG19 Meeting, as described bellow:
1st Rapporteur Meeting (e-meeting)

Duration: 10-24 October 2006

At: http://forum.itu.int/jive/index.jspa?categoryID=2

Terms of Reference: To progress the work on Q.FNAB.


2nd Rapporteur Meeting (e-meeting or face-to-face meeting)

Duration (e-meeting)*: 9-23 January 2007 (e-meeting)

Duration (face-to-face)*: (during SG 19 Rapporteur [NGN-GSI Event], January 2007)

At*: T.B.D

Terms of Reference: To progress the work on Q.FNAB.

*: the decision if this meeting should be an e-meeting or a face-to-face meeting will be decided during the 1st Rapporteur Meeting, take into account budget aspects.


SG 19 Meeting

Duration: 19-26 April 2007

At: Geneva

Terms of Reference: To finish the work on Q.FNAB.


6Detailed Report of Discussions


Q.1/19 met during 24-26 July 2006.

6.1Opening Plenary


The Q.1/19 session was called to order at 11:00hrs on 24 July. The proposed agenda for the Q.1/19 plenary was adopted and approved. The terms of reference for this meeting are to continue the work as assigned to this question.

6.2General Items


The following provides a brief summary of the discussions on and dispositions of input documents that were assigned to the work item “General Items.”


Work item

Documents

4a) General Items

TD GEN: 321; 323, 324, 326, 328, 338, 343, 345R1, 347R1, 351

TD 321: Timetable for the meeting of ITU-T Study Group 19 “Mobile Telecommunication Networks” (Geneva, 19-27 July 2006). For information.

TD 323: NGN and satellite work; and Intersector Coordination Group on Satellite (ICG-SAT) Matters. For information.

TD 324: Requirements and framework for CGOE components. For information.

TD 326: LS on NGN Protocol Sets. For information.

TD 328: Development of a PDNR ITU-R M.[IP CHAR] “Key technical and operational requirements for access technologies to support IP applications over mobile systems” in response to Question ITU-R 223-1/8. The Q.1/19 Meeting has prepared a LS in response to WP 8F, in collaboration with Q.2/19, Q.5/19, and Q.6/13. The LS is in TD 401R1.

TD 338: TD 338 is a LS from ITU-T SG17 titled “Summary of ITU-T Study Groups Security Related Activities”.

TD 343: LS on new working arrangement in SG 16 for ETS/TDR/EW and progress report. For information.

TD 345R1: LS on NGN Work Item on Media Coding Requirements for the NGN. For information.

TD 347R1: TISPAN NGN Release 1. For information.

TD 351: SG 4 Report and Request in its role as Lead SG on Telecommunication Management.



6.3Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB)





Work item

Documents

4b) Q.FNAB

D.42; D.62; D.65; D.66; TD 357

The Q.FNAB version 4.0 (Revision 1) is in TD 357.



The Q.FNAB v.5.0 is in TD 403.


6.4Review of Work Plan for Planned Deliverables


The Work Plan for Q.1/19 was reviewed and is provided in Annex 1.

6.5Closing Plenary of Q.1/SSG


Q.1/19 held its closing plenary at 16:00hrs on Wednesday, 26 July 2006. This report, including all annexes, was reviewed and agreed to. The delegates were thanked for their participation in the Q.1/19 activities at this meeting. Q1/19 discussion meeting was closed at 17:30 hrs.

6.6Review of Meeting Report.


The draft meeting report in TD-405 was reviewed and approved as TD–405 R1.

7Acknowledgements


  • Participants - for their participation at this meeting.

  • Mr. Atsushi Minokuchi, from NTT DoCoMo, for work as Co-Editor of Q.FNAB.



Annex 1 – Work Plan





Rec.

ST

Question

SG

Timing

Priority

Pages

Liaison

Area

Do­main

References*

Subject

Q.1701

R

1/19

19




M

27




15,37

99




Framework for IMT-2000 networks

Q.1711

R

1/19

19




M

29




15,37

99

COM 11-R 116

Network functional model for IMT-2000

Supplement 30 to Q-Series Recommendations

R

1/19

19




M







15,37

00




Specifications of International Mobile Telecommunications-2000

Q.FIFB

N

1/19

19

TBD

H




ITU-T SGs 2, 11, 12, 13, 16, ITU-R WP 8D and 8F (WG-Vision), ITU-D SGs, SDOs (TTA, TTC, ETSI, TIA, ATIS, ARIB, CCSA)

15,37

27




Long-term high-level network functional information flows for beyond IMT 2000 systems

Q.FNAB

N

1/19

19

2Q 2007

H




ITU-T SGs 2, 11, 12, 13, 16, ITU-R WP 8D and 8F (WG-Vision), ITU-D SGs, SDOs

(TTA, TTC, ETSI, TIA, ATIS, ARIB, CCSA)



15,37

27




Long-term high-level network architecture for systems beyond IMT 2000, including definition of functional entities (FEs), allocation of functional capabilities to FEs, and interfaces model among Fes

*) In this column the term “published” means that the previous approved version of the relevant Recommendation is available from the ITU.

Proposed Work Plan for Q.FNAB



Date


Meeting Schedule

Deliv. 2

Q.FNAB


2004

September

1st -15th

Q.1/SSG Meeting

(electronic mtg)

Developing

1st Draft

|

December

13-17


[9th SSG Meeting]

1st SG 19 Meeting


2nd Draft





2005

March


8-22th

Q.1/19 Meeting

(electronic mtg)


Developing

2nd Draft

v 2.1

May

3-6


2nd SG 19 Meeting



3rd Draft



July


5-19

Q.1/19 Meeting

(electronic mtg)

cancelled





September

5-9

3rd SG 19 Meeting



4th Draft



November


8-22

Q.1/19 Meeting

(electronic mtg)

cancelled







2006

January


23-27

4th SG 19 Meeting



Discussions



May


23-6 June

Q.1/19 Meeting

(electronic mtg)

cancelled






July


19-27

5th SG 19 Meeting



5th Draft

v 5.0

October


10-24

Q.1/19 Meeting

(electronic mtg)


6th Draft

v 6.0



2007

January


Q.1/19 Meeting

(T.B.D)


7th Draft

v 7.0




April


19-26

6th SG 19 Meeting



8th Draft

v 8.0

AAP



Terms of Reference for proposed Q.1/19 Rapporteur’s Meetings:

To continue the work on Q.FNAB.


Annex 2 – List of documents





Work item

Documents

4a) General Items

TD GEN: 321; 323, 324, 326, 328, 338, 343, 345R1, 347R1, 351

4b) Q.FNAB

D.42; D.62; D.65; D.66; TD 357

4c) Work Plan

322-GEN

_____________



Attention: This is a document submitted to the work of ITU-T and as such is intended for use by the Member States of ITU, by ITU-T Sector Members and Associates, and their respective staff and collaborators in their ITU-related work. It is made publicly available for information purposes but shall not be redistributed without the prior written consent of ITU. Copyright on this document is owned by the author, unless otherwise mentioned. This document is not an ITU-T Recommendation, an ITU publication, or part thereof.





Yüklə 87.41 Kb.

Dostları ilə paylaş:




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©azrefs.org 2020
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin