Forecast review request instructions




Yüklə 51.16 Kb.
tarix16.04.2016
ölçüsü51.16 Kb.

FORECAST REVIEW REQUEST INSTRUCTIONS

Wisconsin Department of Transportation

DTIM Traffic Forecasting

4802 Sheboygan Ave, Room 901 HFTSB

Madison, WI 53707



Wisconsin Department of Transportation DT1594

Instructions on how to complete form DT1594 Forecast Review Request.

  • Only those forecasts that have been generated, reviewed, and/or approved by the WisDOT Traffic Forecasting Section are considered to be “official” WisDOT forecasts. Therefore, DT1594 should be completed any time a forecast is generated/obtained from a consultant or organization other than the WisDOT Traffic Forecasting Section. If you want the WisDOT Traffic Forecasting Section to prepare the traffic forecast, please complete the Traffic Forecast Request Form (DT1601).

  • The first section of DT1594 should be completed to provide the contact information for the parties submitting the request for the forecast review (Region Contact, Project Manager, Project Supervisor, and Consultant). In this section the Due Date - Requested Completion of Review is required (a due date of ASAP is not accepted). Failure to provide a due date, or a due date of ASAP will be automatically assigned a completion date of 4 to 6 weeks after the request was received.

  • The “Project Description” section of form DT1594 should be filled out with specific information about the project itself. Please provide as much detail about the project description and location as possible to help expedite the review process. It is critical that the geographic limits of the forecast study area be defined clearly to provide for a more efficient review process.

  • The “Forecast Methodology/Description” section of form DT1594 should be filled out to identify the existing/base year of the forecast along with the data sources utilized to generate the existing conditions (i.e. WisDOT Traffic Counts, Special Counts done by an outside agency, VSPOC Data, O-D Surveys, other). Identify the years that the forecast was generated for and whether or not WisDOT is expected to generate/provide an additional/separate forecast for the project. Please indicate whether or not a Paramics or other microscopic simulation model has been or will be developed from this forecast.. Indicate whether previous forecast efforts or traffic studies have been completed for the project and the degree to which consistency with any previous forecasting efforts is desired. A detailed summary of the methodology utilized to generate the traffic forecast should be attached to enable the forecasting section to provide a thorough review of the forecast.

  • The “Forecast Data/Elements Needing Review” section of form DT1594 tells the forecasting section exactly what information on the forecasts need to be reviewed/approved by the WisDOT Traffic Forecasting Section. Please identify whether you are requesting review/approval of the mainline and/or side streets AADT volumes, and/or the intersection peak hour turning movement volumes. If the forecasts to be reviewed were generated for specific times, please be sure to indicate what times the forecasts represent (a.m., p.m., mid-day, Saturday, Special).

  • It should be noted that the forecasting section can also review the design information associated with the project. Please indicate if a review of the % ADT in DHV, Directional Split, % Trucks in DHV, Truck Classification, or other design information associated with the mainline forecasts need to be reviewed. If, you want WisDOT to provide any of the above design information for the mainline please complete the Traffic Forecast Request Form (DT1601) and attach it with this request.

  • Under the “Attachment” section of form DT1594 please attach as much information about the project and forecast as possible. Information that should be attached, if available include:

    • Map identifying project limits and specific segments and intersections included in the forecast (Required)

    • A copy of the forecast to be reviewed (Required)

    • Summary of forecast methodology/Tech Memo summarizing traffic volume development, model calibration, etc.

    • Completed DT1601 form (Required if any additional forecasts or DHV data needs to be generated by WisDOT)

    • O-D Tables (Required if microscopic simulation model has been or will be developed)

    • Other relevant information (i.e. previous forecasts, origin-destination survey data, TIA information, etc.)

  • Finally, provide an explanation of any specific details that would aide in the review of the forecast. The forecasting section would be more than happy to meet with you to discuss any details of the forecast that are too detailed to include with this form, so please indicate if you would like to arrange a meeting.

Please allow 4 to 6 weeks for the completion of the review/approval process for the traffic forecast.

SUBMIT




For expedited service, please submit an electronic copy of the completed DT1594 form to the Region Traffic Forecasting Contact (TFC). The Region Contacts are listed in the Transportation Planning Manual in Chapter 9: Section 1 - Table 1.4.2.




QUESTIONS

Regions please email an electronic version of the final Forecast Review Request (DT1594) and related attachments to:

For other forecasting-related questions please contact:







Vu Dang

Traffic Forecasting, BOPED, DTIM,

Telephone: (608) 266-2571

E-mail: Vu.Dang@dot.wi.gov






Jennifer Murray, AICP

Traffic Forecasting Chief, BOPED, DTIM

Telephone: (608) 264-8722

Email: Jennifer.Murray@dot.wi.gov



FORECAST REVIEW REQUEST

Wisconsin Department of Transportation



DT1594 5/2015

Wisconsin Department of Transportation

DTIM Traffic Forecasting

4802 Sheboygan Ave, Room 901 HFTSB

Madison, WI 53707



Submitted By – Name (First, MI, Last)

     


Region

     


Request Date (m/d/yyyy)

     


Region Contact – Name (First, MI, Last)

     


Region Contact – Email ID

     


Due Date (Requested Completion of Review)

     


Consultant

Name (First, MI, Last)

     


Project
Manager


Name (First, MI, Last)

     


Project Supervisor

Name (First, MI, Last)

     


(Area Code) Telephone Number

     


(Area Code) Telephone Number

     


(Area Code) Telephone Number

     


Email ID

     


Email ID

     


Email ID

     


For TF Office Use Only

Control Number

     


Date Received (m/d/yyyy)

     .


Assigned To

     


Estimated Date of Completion (m/d/yyyy)

     


Date Sent Out (m/d/yyyy)

     


PROJECT DESCRIPTION

Project ID(s)

     


Charge Code

     


County(ies)

     


Project Type

     


Route(s) to be Reviewed:

     


Forecast Study Limits (North, South, East, West Termini):

     


FORECAST METHODOLOGY/DESCRIPTION

Existing/Base Year(s):

Existing Data Sources

     

 WisDOT Counts

 Special Counts

 VSPOC Data

 O–D Surveys

 Other:      

Forecast Year(s):

Forecast Methodology Utilized (TDM, TAFIS, Paramics):

     

     

     

     

     

     

     

 Yes

 No


Is an additional/separate forecast needed from WisDOT?

If Yes, please complete and attach the Traffic Forecast Request Form (DT1601).



 Yes

 No


A Paramics or other microscopic simulation model has been or will be developed?

If Yes, a Peer Review of the model will need to be arranged.



 Yes

 No


Have previous forecasts efforts and/or traffic studies been conducted?

If yes, please attach a copy/description of the previous forecasting efforts and identify the degree to which consistency between the previous and current forecast is desired.

FORECAST DATA/ELEMENTS NEEDING REVIEW (Check the box for each data type/element of the forecast that requires review/approval)

 Traffic Volumes

 Mainline AADT Volumes  Side Street AADT Volumes  Turning Movement Volumes (identify time periods to be reviewed)

 Mainline Design Values

 % ADT in DHV (K Values)  Directional Split  % Trucks in DHV & Truck Classification  Other (please describe):      

ATTACHMENTS (Check the box next to each item attached)

 County or Municipality map showing project location (Must accompany all requests)

 A copy of the forecast to be reviewed, preferably in electronic format (Must accompany all requests)

 Summary of forecast methodology utilized/Tech Memo summarizing traffic volume development, model calibration tests, etc.

 Completed DT1601 Form (Required if a WisDOT forecast is to be generated)

 O–D Tables (Required if Paramics or other microscopic simulation model has been or will be developed)

 Other relevant data associated with the forecast (previous forecasts, O–D survey data, TIA information, etc.)


ADDITIONAL INFORMATION ABOUT THE PROJECT (Specify below other pertinent information/remarks).

     